Case Study: How to Get a Landscape Concept Before the Surveyor Arrives and Save Time
Discover how a landowner used FormSpace to create a functional landscape concept before the surveyor's visit, significantly accelerating the design process and saving time.
The traditional approach to landscape design often begins with a surveyor's visit, providing precise data on the terrain and plot boundaries. However, this method isn't always the most efficient. More and more landowners are embracing the idea of creating a preliminary concept even before a specialist with a theodolite appears on their land. This approach significantly speeds up the process, saves resources, and yields a more informed outcome.
The Traditional Path: Surveying as the First Step
The classic scenario dictates that a surveyor first visits the site to take precise elevation readings, terrain variations, boundaries, and the location of existing structures and utilities. Based on this data, a topographic survey (geopodosnova) is created – a detailed plan then passed on to the landscape designer. The designer, using this information, begins to develop a project for zoning, pathways, and the placement of objects and plants. This path is logical as it ensures maximum accuracy. However, it has its drawbacks: waiting time for surveying work, service costs, and, most importantly, the lack of opportunity for the landowner to actively participate in forming the overall idea at the earliest stage. Situations often arise where, after receiving the topographic survey, it's discovered that the owner's initial ideas don't fit the actual terrain or dimensions, leading to starting over, wasting time and money.
Why a Preliminary Concept is Beneficial
Creating a preliminary concept before the surveyor's visit is not an attempt to bypass professionals, but a way to enhance their work efficiency. With a rough but well-thought-out concept in hand, you can:
- Save time: You can start contemplating and visualizing your ideas immediately, without waiting for measurement results. This can shorten overall design timelines by 2-3 weeks.
- Reduce costs: A clear understanding of desired zoning and the placement of key elements (e.g., a recreation area of 25-30 m² or a playground) allows for a more precise technical brief for the surveyor and other specialists. Fewer revisions mean fewer expenses.
- Make informed decisions: You can plan functional zones, the location of the house, garage, bathhouse, orchard, vegetable garden, and BBQ area in advance. Even without precise data, you can outline approximate path widths (e.g., 1.2 meters for main paths and 0.8 meters for secondary ones) and understand how they will connect different parts of the plot.
- Visualize ideas: Many people grasp information better when they see it graphically. A preliminary concept allows you to see how your dreams of a garden or terrace will look on a plan. This is especially important for irregularly shaped plots or those with existing structures.
What Data is Needed for Preliminary Planning
Creating a preliminary concept doesn't require ultra-precise measurements, but basic information is essential:
- Plot photos: Take pictures from all sides, from different angles, paying attention to existing structures, trees, shrubs, as well as views from and onto the plot.
- Satellite imagery: Google Maps, Yandex.Maps, or other mapping services can provide a general idea of the plot's shape, size, and immediate surroundings.
- Approximate dimensions: Even measuring by steps or with a tape measure will give a sufficient idea of the plot's length and width. For example, a 10-sotka plot (1000 m²) might be 25x40 meters, and a 15-sotka plot — 30x50 meters. Knowing these parameters helps to estimate scale.
- Wishes and needs: A list of functional zones you want to see on the plot (children's playground, BBQ area, vegetable garden, flower beds, parking space, utility block). Specify which elements are mandatory and which are desirable.
- Orientation to cardinal directions: This is critical for placing plants, terraces, and house windows. For example, fruit trees are best planted on the south or southeast side, and a recreation area should be positioned so that the afternoon sun doesn't interfere.
Steps for Creating a Concept Without Precise Data
- General zoning: Divide the plot into large functional zones: residential (house, garage), recreation (terrace, gazebo, grill), utility (shed, compost pile), vegetable garden/orchard, children's playground. Consider the connections between zones; for example, the BBQ area should be near the kitchen or terrace.
- Placement of key objects: Outline the position of the house, garage, bathhouse, large trees, or water features. Remember regulatory setbacks from plot boundaries (e.g., 3 meters for a residential building from a neighboring plot).
- Defining main routes: Consider how you will move around the plot. Where will the main entrance be, where is the path to the vegetable garden, where to the recreation area. Main path widths should be at least 1.2 meters for comfortable passage of two people.
- Considering terrain (approximately): If the plot has a clear slope, note it. For example, if the plot has a slope of 1 meter per 10 meters of length, this should be considered when placing terraces or steps.
- Sketching ideas: Use sketches, collages, or specialized software to visualize your ideas. At this stage, accuracy is less important than understanding the overall picture. Think about the style you want to see. More ideas can be found in the article 'Basic Principles of Plot Zoning'.
Common Mistakes When Rushing and Lacking a Plan
- Object placement without considering cardinal directions: For example, planting sun-loving plants in the shade or placing a terrace on the north side where it's always cool.
- Insufficient consideration of passages and driveways: Paths that are too narrow to pass with a wheelbarrow, or lack of space for a car to turn around in the garage. A typical mistake: "first they built a gazebo, and then realized it interfered with the passage of equipment for septic tank maintenance".
- Ignoring existing utilities: Without knowing the exact location of water pipes, gas lines, or electrical cables, they can be damaged during excavation work.
- Lack of connection between functional zones: For example, a children's playground located too far from the visible area from the house or garden, making supervision inconvenient.
- Excessive detail at an early stage: Trying to plan every bush and flower before the main zones and paths are defined. This leads to constant revisions and loss of focus. First, define the framework, and then fill it with details, for example, using tips from the article 'How to Choose Plants for Your Plot'.
Adjusting the Concept After Receiving the Topographic Survey
Once the surveyor provides precise data, the preliminary concept isn't discarded; it's refined. This is a key advantage of the approach. You will be able to:
- Adjust dimensions: If the plot turns out to be slightly wider or narrower than you thought, it's easy to change the scales in the project.
- Account for actual terrain: Make changes to the placement of terraces, retaining walls, and steps. For example, if a sharp elevation change is found where a gazebo was planned, it can be slightly moved or additional terracing can be incorporated.
- Precisely place objects: Relocate the house or other structures, adhering to all setbacks and considering actual boundaries.
- Optimize utilities: Lay paths and engineering networks considering underground utilities, avoiding conflicts.
How to Plan a Concept in FormSpace Before the Surveyor's Visit
FormSpace is the ideal tool for creating a preliminary plot concept without needing to wait for precise surveying data. You can start planning almost immediately, using only general ideas about your plot.
To begin, upload photos of your plot to the 3.1 Design by Photo module. This will allow you to visualize the current state and use it as a basis for future changes. If you have an approximate plot diagram, even hand-drawn, you can upload it to the 1.0 Plot Plan module and outline the main contours. Then, using the 2.1 AI Concept module, you can generate various zoning and object placement options by simply specifying approximate plot dimensions (e.g., 20x30 meters) and your wishes for functional zones (BBQ area, vegetable garden, playground, parking). The AI will suggest several solutions, considering general landscape design principles and your preferences.
After receiving the AI concepts, you can choose the most suitable one and refine it in modules 1.1-1.7 (Plan, Zones, Objects). At this stage, you can sketch out main paths, place large objects (house, garage, gazebo), and mark areas for plants, guided by photos and approximate dimensions. This will create a clear diagram that you can show to the surveyor, explaining your expectations. Once precise surveying data is obtained, you can easily make adjustments to your project, for example, accurately setting zone boundaries, clarifying object sizes, or adding elevation marks, which will significantly simplify the transition to detailed design.
FAQ
Can this approach completely bypass the need for a surveyor?
No, it's impossible to completely do without a surveyor for precise landscape design and, especially, for construction work on the plot. Surveying data is necessary for creating working drawings, calculating earthwork volumes, and accurately placing foundations and utility lines. A preliminary concept merely optimizes the process, making it more manageable and less costly.
How accurate will a concept developed without surveying be?
The accuracy of a preliminary concept will be sufficient for general zoning, defining style, and approximate placement of large objects. It won't be suitable for construction or precise material calculations, but it will allow for forming a clear vision of the plot. After receiving surveying data, the concept will be refined and developed into working drawings.
What if the surveyor discovers something unexpected on the plot?
If the surveyor discovers significant elevation changes, hidden utilities, or other features not accounted for in the preliminary concept, it will need to be adjusted. The advantage of FormSpace is that changes are easily editable, and you won't have to start from scratch. It will be a refinement, not a complete redesign of the project.
Does this approach save money?
Yes, this approach often saves money. You avoid multiple revisions of the design project due to ideas not matching real conditions. A clearer technical brief for specialists can also reduce their working time and, consequently, service costs. Fewer errors in early stages mean fewer expensive corrections in later ones.
What are the risks of this approach?
The main risks are that the preliminary concept might be insufficiently flexible to changes or too detached from reality if the initial data (even approximate) was incorrect. However, using tools like FormSpace with its visualization and AI-generation capabilities minimizes these risks, helping to create realistic concepts that are easily adaptable.
For which plots is this method most effective?
This method is particularly effective for medium-sized plots (from 6 to 20 sotkas) with relatively flat terrain or with an already formed understanding of its features. However, it is also useful for complex plots, as it allows for pre-planning zoning and main terracing solutions, which significantly facilitates further work with precise data.
A Smooth Next Step
Preliminary plot planning is not only a way to save time and money but also an opportunity to actively participate in creating the landscape of your dreams. Start by forming a general idea, use available visualization tools, and be ready for constructive adjustments. This approach will make the design process more enjoyable and predictable, and the result will maximally align with your expectations.
Published:

Volodymyr Vybornyi
Landscape designer, founder of https://formspace.design/